A brief write up on IPDS for inclusion in Webportal of WBSEDCL

INTEGRATED POWER DEVELOPMENT SCHEME (IPDS) IN WBSEDCL

  The IPDS Scheme launched by MoP, GOI for strengthening of Distribution Infrastructure in the Urban areas will be implemented in 18 Regions of WBSEDCL covering 121 Towns at the total project cost of Rs.2866.76 Crore. 60% of the project cost will be received from MOP, GOI as grant, 25% from GOWB as grant and balance 15% is to be arranged by WBSEDCL.

The broad objective of the scheme is to provide 24x7 quality power supplies for consumers, Reduction of AT&C losses as per trajectory finalized by MOP in consultation with States and providing access to power to all households of the urban area.


Scope of work for achievement of the broad objectives:



Description of work Quantity Project cost (Rs. in Cr.)
New 33/11 kV Sub-station with associated 33 kV line 45 nos. (2x10 MVA) 387.64
33 kV system augmentations with renovation of existing 33/11 kV sub-station. 89 nos. 379.65
Drawal of 11kV line (New & augmentation) 3541 KM 376
Drawal of LT line (New & augmentation) 3432 KM 145.72
Drawal of AB Cable 8692 KM 1082.58
Installation of DTr. (New & Augmentation) 6015 Nos 230.69
Replacement of Meter 13,00,843 Nos 220.93
Installation of Roof top Solar panel 3016 Nos 43.59