Hydel Projects

Particulars of running Hydro-power stations under Hydel HQ

Name of the Projects Installed Capacity
Rammam Hydel Project 51 MW
(4 x 12.75 MW)
Teesta Canal Fall Hydel Project (PS-I, PS-II & PS-III) 67.5.MW
(3 PS x 3 Units x 7.5 MW)
Jaldhaka HEP 44 MW
Stage – I (4 x 9 MW) + Stage – II (2 x 4 MW)
Sidrapong HEP 600 KW (3 x 200 KW)
Little Rangit HEP 2 MW (2 x 1.0 MW)
Rinchington HEP 2 MW (2 x 1.0 MW)
Fazi HEP 1.2 MW (1 x 1.2 MW)
Mungpo-Kalikhola HEP 3 MW (3 x 1.0 MW)


GENERATION FROM THE HYDRO POWER STATIONS DURING 2015-16:

SL No. Name of the Power Station     Generation figure for 2015-16 Target fixed by CEA for 2016-17
Target fixed by CEA Achieved
1 Rammam Hydel Project (Stage-II) [4x12.75 MW] 238 MU 253.9751 MU 238 MU
2 Jaldhaka Hydel Project (Stage-I)[4x9 MW) 141 MU 137.688 MU 158MU
3 Jaldhaka Hydel Project (Stage-II)[2x4 MW] No target fixed by CEA being the Station Capacity below 25 MW. 35.763 MU -------
4 Teesta Canal Fall Hydel project[3x3x7.5 MW] No target fixed by CEA being the Station Capacity below 25 MW 79.9891MU --------
5 Small Hydel Projects (SHP)      
  Mungpoo Kali Khola SHP(3x1 MW) No target fixed by CEA being the Station Capacity below 25 MW 7.299 MU  
  Rinchington SHP (2x1 MW) 1.2933 MU  
  Little Rangit Hydel SHP(2x1 MW) 8.280 MU  
  Fazi SHP (1x1200 KW) 1.365 MU  
  Sidrapong SHP (2 x 0.2 MW) 0.1155 MU  
  Total Generation   525.768 MU  



  TEESTA CANAL BANK SOLAR PV POWER STATION (10 MW) at Haptiagach, Uttar Dinajpur (first Canal bank project in India and first Mega level Solar Project in West Bengal) is under construction. The 1st Power Block of 2 MW will be commissioned by May 2016.



  Rammam Intermediate HEP (12 MW) in Dist. Darjeeling is under implementation.