Name of the Projects | Installed Capacity |
---|---|
Rammam Hydel Project | 51 MW (4 x 12.75 MW) |
Teesta Canal Fall Hydel Project (PS-I, PS-II & PS-III) | 67.5.MW (3 PS x 3 Units x 7.5 MW) |
Jaldhaka HEP | 44 MW Stage – I (4 x 9 MW) + Stage – II (2 x 4 MW) |
Sidrapong HEP | 600 KW (3 x 200 KW) |
Little Rangit HEP | 2 MW (2 x 1.0 MW) |
Rinchington HEP | 2 MW (2 x 1.0 MW) |
Fazi HEP | 1.2 MW (1 x 1.2 MW) |
Mungpo-Kalikhola HEP | 3 MW (3 x 1.0 MW) |
SL No. | Name of the Power Station | Generation figure for 2015-16 | Target fixed by CEA for 2016-17 | |
---|---|---|---|---|
Target fixed by CEA | Achieved | |||
1 | Rammam Hydel Project (Stage-II) [4x12.75 MW] | 238 MU | 253.9751 MU | 238 MU |
2 | Jaldhaka Hydel Project (Stage-I)[4x9 MW) | 141 MU | 137.688 MU | 158MU |
3 | Jaldhaka Hydel Project (Stage-II)[2x4 MW] | No target fixed by CEA being the Station Capacity below 25 MW. | 35.763 MU | ------- |
4 | Teesta Canal Fall Hydel project[3x3x7.5 MW] | No target fixed by CEA being the Station Capacity below 25 MW | 79.9891MU | -------- |
5 | Small Hydel Projects (SHP) | |||
Mungpoo Kali Khola SHP(3x1 MW) | No target fixed by CEA being the Station Capacity below 25 MW | 7.299 MU | ||
Rinchington SHP (2x1 MW) | 1.2933 MU | |||
Little Rangit Hydel SHP(2x1 MW) | 8.280 MU | |||
Fazi SHP (1x1200 KW) | 1.365 MU | |||
Sidrapong SHP (2 x 0.2 MW) | 0.1155 MU | |||
Total Generation | 525.768 MU |
TEESTA CANAL BANK SOLAR PV POWER STATION (10 MW) at Haptiagach, Uttar Dinajpur (first Canal bank project in India and first Mega level Solar Project in West Bengal) is under construction. The 1st Power Block of 2 MW will be commissioned by May 2016.
Rammam Intermediate HEP (12 MW) in Dist. Darjeeling is under implementation.