Name of the Projects | Installed Capacity |
---|---|
Rammam Hydel Project | 51 MW (4 x 12.75 MW) |
Teesta Canal Fall Hydel Project (PS-I, PS-II & PS-III) | 67.5.MW (3 PS x 3 Units x 7.5 MW) |
Jaldhaka HEP | 44 MW Stage – I (4 x 9 MW) + Stage – II (2 x 4 MW) |
Sidrapong HEP | 600 KW (3 x 200 KW) |
Little Rangit HEP | 2 MW (2 x 1.0 MW) |
Rinchington HEP | 2 MW (2 x 1.0 MW) |
Fazi HEP | 1.2 MW (1 x 1.2 MW) |
Mungpo-Kalikhola HEP | 3 MW (3 x 1.0 MW) |
Sl No. | Name of the Power Station | Generation figure for 2015-16 | Target fixed by CEA for 2016-17 | |
---|---|---|---|---|
Target fixed by CEA | Achieved | |||
1 | Rammam Hydel Project (Stage-II) [4x12.75 MW] | 238 MU | 253.9751 MU | 238 MU |
2 | Jaldhaka Hydel Project (Stage-I)[4x9 MW) | 141 MU | 137.688 MU | 158MU |
3 | Jaldhaka Hydel Project (Stage-II)[2x4 MW] | No target fixed by CEA being the Station Capacity below 25 MW. | 35.763 MU | ----- |
4 | Teesta Canal Fall Hydel project[3x3x7.5 MW] | No target fixed by CEA being the Station Capacity below 25 MW | 79.9891MU | ----- |
5 | Small Hydel Projects (SHP) | |||
Mungpoo Kali Khola SHP(3x1 MW) | No target fixed by CEA being the Station Capacity below 25 MW | 7.299 MU | ||
Rinchington SHP (2x1 MW) | 1.2933 MU | |||
Little Rangit Hydel SHP(2x1 MW) | 8.280 MU | |||
Fazi SHP (1x1200 KW) | 1.365 MU | |||
Sidrapong SHP (2 x 0.2 MW) | 0.1155 MU | |||
Total Generation | 525.768 MU |