DEENDAYAL UPADHYAYA GRAM JYOTI YOJANA (DDUGJY)

  The Ministry of Power, Government of India (MoP), has launched the ‘Deendayal Upadhyaya Gram Jyoti Yojana (DDUGJY)’ with the following broad objectives:
i) Creation of new infrastructure for providing access to power for all households.
ii) Physical separation of HT feeders for 24x7 Power for agricultural and non-agricultural consumers
iii) Strengthening of sub-transmission and distribution systems and metering at all levels for reduction of AT&C losses


  The scheme sanctioned by the Ministry of Power, Govt. of India for the State of West Bengal with the following major components.

i) Electrification of 14 nos Un-electrified (UE) villages in South 24 Parganas Districts under Sundarban Area including electricity connection to 6790 no BPL households.
ii) Separation of 621 no HT feeders (New HT OH line: 17579 KM, New DTR: 14287 No) for segregation of agricultural load from existing feeders
iii) Creation of Rural Electricity infrastructure (New HT OH Line: 5170 Km, New DTR: 10560 No, New LT OH line: 5660 Km, New LT OH line with AB Cable: 2320 Km, Conversion of existing LT OH line by AB Cable: 19737 KM, Capacity Augmentation of Existing DTR: 2160 No, BPL households connections: 24515 No) for connecting un connected rural households.
iv) Installation of 80 no new 33/11 KV Substations , capacity augmentation of 106 no existing 33/11 KV Substation, renovation/augmentation of 2447 Km of existing HT lines for strengthening of rural electricity backbone infrastructure.
v) Creation of rural electricity infrastructure (HT: line 10 KM) under Sansad Adarsh Gram Yojana(SAGY)
vi) VI. Installation of energy meters in 1.23 lakhs un-metered Distribution Transformers, 512 no Feeders and replacement of approx 13.66 lakhs defective/electromagnetic consumer meters for seamless accounting and auditing of energy at all levels in the distribution system. Relocation /shifting of approx 3.97 lakhs existing consumer meters outside the premises of consumers including associated service cables.


  The total financial outlay of the project is Rs.4304.50 Crore including Project Management Agency (PMA) Charges. The capital subsidy for the scheme is 60% from Govt. of India, 25% from Govt. of West Bengal and the balance 15% will be contributed by WBSEDCL for the project.

The LoA for electrification of 14 no Un Electrified (UE) & 59 No Partially Electrified (PE) villages including connections to BPL households under South 24 Parganas District has been placed & work is in progress. The target for completion is February 2017. The execution of 20 no new 33/11 KV Substations & capacity augmentation of 106 no existing 33/11 KV Substations have been taken up departmentally. The balance work under the project will be executed on turnkey basis. Tenders have already been published for selection of vendors which have been scheduled for opening by September 2016.

DETAIL SCOPE OF WORK UNDER DEENDAYAL UPADHYAYA GRAM JYOTI YOJANA (DDUGJY)


Sl No SCOPE OF WORK UNIT QUANTITY
INVOLVEMENT
TOTAL COST
(Rs. In Lakhs)
1. ELECTRIFICATION OF UE VILLAGES (14 no villages in Gosaba, Namkhana & Patharpratima Block unde south 24 Pargana District)      
a) Drawal of new 11KV Line DTR No 294 605
b) Drawal of new 11KV Spur Line KM 165 623
c) Drawal of new LT AB Cable KM 530 3,254
d) Connection to BPL House Holds No 6,790 204
  SUB TOTAL(I):     4686
2. FEEDER SEPARATION :      
I) PHYSICAL SEPARATION OF H.T FEEDERS FOR AGRICULTURAL & NON AGRICULTURAL CONSUMERS      
a) New 11KV Bay NO 625 4,508
b) New 11KV Line (621 no feeder) KM 17,579 78,869
c) Installation of new Distribution Transformer NO 14,287 32,619
  SUB TOTAL(II):     115,996
3. ELECTRICITY INFRASTRUCTURE FOR ACCESS TO RURAL HOUSE HOLDS      
a) Capacity Augmentation of existing  Dist.Transformers No 2,160 4,337
b) Conversion of existing LT O.H. Line to AB Cable KM 19,737 87,985
c) Installation  of new 11KV Line Dist.Transformer NO 10,560 28,817
d) New 11KV Spur Line KM 5,170 15,609
e) New LT AB Cable line KM 2,320 14,347
f) New LT O.H Line KM 5,660 21,162
g) Connection of BPL HHs NO 24,515 735
  SUB TOTAL(III):     172,993
4. METERING      
a) Installation of Dist Transformer metering NO 122,597 19,475
b) Installation of FEEDER Metering NO 512 77
c) Replacement of defective /electromagnetic(old) consumer  Metering NO 1,366,391 16,631
d) Shifting of existing consumer metering NO 396,949 7,939
  SUB TOTAL(IV):     44,122
5. SANSAD ADARSH GRAM YAJONA      
a) Installation  of new 11 KV Bay NO 1 7
b) Drawal of new 11KV Line KM 10 52
  SUB TOTAL(V): KM 10 60
6. SYSTEM STRENGTHENING WORK   0 0
a) New 33KV Line KM 1,969 11,633
b) Augmentation of existing 33 KV Line KM 82 379
c) Construction of New 33/11KV Sub Station NO 80 38,945
d) Augmentation of existing 33/11KV Sub Stations NO 106 10,953
e) New 11KV Line KM 2,781 12,619
f) Augmentation/ Renovation  of existing 11KV Line KM 2,365 6,008
g) Installation of new 33KV Bay NO 77 5,698
  SUB TOTAL(VI):     86,234
   Total Project cost (Rs. in Crore):     4240.90
  PMA Charges @0.5% of the project cost (grant from GoI) (Rs in Crore):     21.20
  PMA Charges 1% of the Project cost :
(WBSEDCL Contribution)(Rs in Crore):
    42.40
  Total Sanctioned Project Cost(Rs in Crore):     4304.50