Initiatives

Activities under Energy Conservation


image not foundLED Street Light under Demo Project:

Implementation of Energy Efficiency measures to showcase the potential of Energy Efficiency by LED Street Lighting project :


a) Implementation of Pilot LED Street Light (144 nos.) Project under Kolkata Municipal Corporation area.

b) 126 nos. LED Street Lights replaced under 7 nos. Municipality namely Siliguri Town & Sub-urban, Kurseong, Darjeeling, Jalpaiguri, Coochbehar and Dinhata

c) LED (Light Emitting Diode) Street Light Project at Bolepur, Sainthia and Rampurhat 132 KV Sub-Station under Burdwan Area Office of WBSETCL.

d) LED (Light Emitting Diode) Street Light Project at Arambag 400/132/33 KV Sub-Station of WBSETCL

e) LED Street Light project completed in Welfare Association and Blind School of North Bengal and North Bengal Zonal Store under Siliguri Zonal Office of WBSEDCL

f) LED (Light Emitting Diode) Street Light Project at Changrabandha and Mekhligunj 33/11 KV Sub-Station of WBSEDCL

 

image not foundPilot LED Village Campaign :

a. By installing 50 nos. 18 Watt LED Street lights and distributing of 414 nos. of 5 Watt LED Bulb to 207 nos. domestic consumers of Dandirhat village under Basirhat Division.

b. By installing 59 nos. LED Street Light along the Bakkhali Sea shore under Namkhana Gram Panchayet Area.

c. By installing 67 nos. LED Street Light from Khudiguria Shahid Smiriti to Chowranghee Bazar More alongwith 175 nos. household (175 X 2 = 350 nos. 5 Watt Philips make LED Lamp) at Gangasagar, Narayanibad, Bagbazar, Mondasadwip khasmahal, Rudranagar, Bamankhal, Digambari, Chemaguri village of Sagar Island under Kakdwip Division

 

image not foundEnergy Conservation Building Code (ECBC):

Gazette Notification on amended ECBC as per climatic zone of West Bengal will be issued shortly from the Office of Department of Power & NES, Govt. of West Bengal.

 

image not foundPAT Scheme :

PAT Cycle – I is at an advance stage of completion. Only WBPDCL is yet to submit the Form – 1, M&V Report, Form – B and Sector Specific Proforma. BEE is on the verge of commencing the second phase of PAT.

 

image not foundImplementation of Investment Grade Energy Audit (IGEA) at Vidyut Bhawan, from Ground Floor to 6th Floor is under process.

 

image not foundMuDSM :

Workshop held on 27th November, 2014 and accordingly Rajpur- Sonarpur Municipality agreed to implement the project and send their database and cost estimate for further necessary action which is again placed to BEE for their approval.

 

image not foundAgri DSM :

One sample survey was held on 5 district (namely East Medinipur, Burdwan, Hooghly, Bankura including Bishnupur and Murshidabad) and the Report was submitted to BEE. As per the report, Average Reduction in annual operation cost of an amount of Rs.17122 per consumer per year can be achieved.

 

image not foundAwareness Programme :

i. Industrial Workshop at Siliguri, Maldah, Burdwan and Midnapur District.

ii. Teacher’s Training programme in association with Indian Council of Science Museum at Kolkata, Siliguri, Burdwan, North 24 Parganas and South 24 Parganas.

iii. Agricultural DSM awareness programme on efficient use of pumps, motors, check valves etc. at strategic locations. (along with academicians of agri universities).

iv. Awareness about Star Label equipments among Dealers of Electrical appliances at North/South 24 Parganas, Siliguri, Durgapur, Midnapur.

v. Distribution of booklet containing tips on Energy Savings during festive season in the districts of West Bengal.

vi. Awareness programme is carried out throughout the year for using Star Label equipments among all common people in daily life.


image not found

Implementation of Bachat Lamp Yojana Scheme for all domestic Consumer from June 2011:

Targeted Consumer: 1 crore: CFL lamp to be required @3Pc/consumer comes to 3crore CFL Deposit


image not found

Initiation of Investment Grade Energy Audit for 16 nos. Govt. Building : Estimated Completion on 30.04.2011 Deposit


image not found

Pilot LED based Street Lighting is completed in 144 out of 273 location under KMC. Estimated Completion on 30.06.2011 Deposit


image not found

Assessment of Energy Conservation Potential in the following Sectors


-  
Commercial Building sector including Govt. Building
-  
Municipality Sector

image not found
Pilot LED based Street Lighting is completed in 144 out of 273 location under KMC. Estimated Completion on 30.06.2011